Before work
11 items- ✓
PPE worn: chemical-resistant gloves, respirator if required
- ✓
Substrate clean, dry and conforming — surface prep complete
- ✓
Safety Data Sheets (SDS) for products reviewed
- ✓
Favorable weather: no rain, temp within manufacturer's range
- ✓
Fall protection in place if working on roof
- ✓
Fire extinguisher at hand if open flame (torch)
- ✓
Application per manufacturer's specifications
- ✓
Overlaps and dimensional flashings per spec
- ✓
Ventilation ensured in confined space (RSST section XXVI)
- ✓
Singular points treated: corners, expansion joints, penetrations
- ✓
Propane cylinders upright and away from flame
After work
4 items- ✓
Waterproofing test performed (flood test or smoke test)
- ✓
Mechanical protection installed over membrane
- ✓
Equipment cleaned, products stored per SDS
- ✓
Fire watch rounds completed (min. 1 hr after hot work)
More checklists — Building Envelope & Roofing
Roofing
Installation of membranes, shingles and roofing
16 checks
Sheet metal / Tinsmith
Sheet metal work, flashing and metal cladding
11 checks
Insulation / Lagging
Thermal insulation of pipes and equipment
11 checks
Glazing
Installation of glass, curtain walls and windows
12 checks
Glazier / Curtain wall installer
Structural curtain walls, assembly and high-rise installation
16 checks