Safety checklist — Exterior cladding

Installation of siding, cladding and façade finishes. Based on Québec's Construction Safety Code (CSTC) and CNESST standards.

Before work

11 items
  • PPE worn: hard hat, safety glasses, gloves; falls per 2.9.1 (not only > 3 m)

    ℹ️ Also no-height cases, 1.2 m on a vehicle, 1.5 m with a load. Harness is last resort (2.9.2).

  • Scaffold or lift inspected and compliant

  • Materials stored securely — panels tied against wind

  • Weather checked — stop per manufacturer / risk analysis

    ℹ️ 40 km/h is not a CSTC threshold.

  • Vapor barrier and membrane installed per plans

  • Cutting tools inspected — guards in place on saws

  • Fasteners per spec — spacing and type respected

  • Expansion joints per manufacturer's specifications

  • Offcuts and trimmings collected regularly

  • Guardrails or harness maintained at all times at edges (CSTC 2.9)Critical

    ℹ️ CSTC 2.9.1: also no-height cases, 1.2 m on a vehicle, 1.5 m with a load, more than 3 m otherwise. Harness is last resort (2.9.2).

  • Alignment and level checked regularly

After work

3 items
  • Caulking and sealant applied at joints and perimeters

  • Visual inspection — no loose or warped panels

  • Offcuts sorted and recovered — perimeter cleaned

14 verification items — use this checklist on-site with the app

Use on-site — free

PDF reports, history and team management in the app

For information only — this is not legal advice. OK Sécurité is an independent company with no affiliation to the CNESST: we are not mandated, endorsed or certified by it. Completing a checklist here does not by itself establish your compliance — your exact obligations depend on your job site and your prevention program. Where there is any discrepancy, the official text published by Légis Québec or the CNESST prevails.

Risks and prevention — Exterior cladding

Siding and cladding installation at height exposes workers to falls, cuts from sharp materials, and wind hazards on large-surface panels. Scaffolds and MEWPs follow CSTC 3.9 and 2.15.16 / 2.9 — not a separate “cladding fall plan” rule.

Cutting fibre cement panels can release silica dust. Wet cutting or tools with integrated dust collection are recommended. Workers must wear P100 respiratory protection when dry-cutting.

QR code — OK Sécurité