Safety checklist — Insulation / Lagging
Thermal insulation of pipes and equipment. Compliant with Québec's Construction Safety Code (CSTC) and CNESST standards.
Before work
8 items- ✓
PPE worn: gloves, respirator if fibers or asbestos, glasses, coverall
- ✓
Asbestos survey verified if existing building (pre-1999)
- ✓
SDS for insulation products reviewed
- ✓
Asbestos management registry reviewed if applicable
- ✓
Pipes de-energized / out of service before work if possible
- ✓
Ventilation in place if working in confined area
- ✓
Insulation fibers wetted to limit airborne particles
- ✓
Insulation cutting with local exhaust if required
After work
3 items- ✓
Insulation waste bagged and labeled (asbestos if applicable)
- ✓
Area cleaned — no dry sweeping if fibers
- ✓
Disposable coverall disposed of if contaminated
More checklists — Building Envelope & Roofing
Roofing
Installation of membranes, shingles and roofing
16 checks
Waterproofing
Installation of membranes and waterproofing products
15 checks
Sheet metal / Tinsmith
Sheet metal work, flashing and metal cladding
11 checks
Glazing
Installation of glass, curtain walls and windows
12 checks
Glazier / Curtain wall installer
Structural curtain walls, assembly and high-rise installation
16 checks