Safety checklist — Surveying / Layout
Topographic surveys, staking and dimensional control. Compliant with Québec's Construction Safety Code (CSTC) and CNESST standards.
Before work
9 items- ✓
PPE worn: high-visibility vest, hard hat, safety shoes
- ✓
Site plan reviewed — traffic zones and hazards identified
- ✓
Equipment calibrated — total station, GPS RTK, level
- ✓
Coordination with machine operators — signal before entering zone
- ✓
Reference points (benchmarks) located and verified
- ✓
Visual contact maintained with machine operators at all times
- ✓
Never position between a wall and a moving machine
- ✓
Stakes and markers clearly identified — colored tape visible
- ✓
Data recorded and backed up regularly
After work
3 items- ✓
Stakes firmly driven — protected from accidental displacement
- ✓
Data transferred and verified — layout report produced
- ✓
Deviations reported immediately if out of tolerance
More checklists — Equipment & Hoisting
Lifting / Crane operations
Crane operations and load handling
18 checks
Scaffolding
Assembly, use and dismantling
16 checks
Heavy equipment
Operation of excavators, loaders and construction equipment
14 checks
Elevator installation
Installation and maintenance of elevators and freight elevators
12 checks
Tower crane
Operation of fixed and self-erecting tower cranes
15 checks
Commercial diver
Underwater work, cofferdams and subaquatic inspections
15 checks